Honeywell announced a $79-million renewable energy and building retrofit program with Eastern Illinois University (EIU) in Charleston, Ill. The program, which combines energy-efficient facility upgrades with one of the largest biomass-fueled heating plants on a university campus, will help EIU address deferred maintenance, improve its infrastructure, and save approximately $140 million in energy and operating costs over the next two decades.
EIU will finance the improvements and use the savings, guaranteed by Honeywell through a 20-year performance contract, to pay for the work. As a result, the program will not place a burden on the university’s budget, or require additional taxpayer dollars or student fees.
The focal point of the program is the construction of a new steam plant on the southeast corner of campus that will be driven by two large biomass gasifiers, the first application of this technology in the region. The plant will use wood chips sourced from the local logging industry to generate steam and heat buildings on campus. And it will replace the university’s aging steam plant, which is inconveniently located in the center of campus, consumes more than 10,000 tons of coal per year and requires constant maintenance.
For more information, read the press release.



